Hewlett-Packard Integrity cx2600 Maintenance Manual
Download Maintenance manual of HP Integrity cx2600 Server for Free or View it Online on All-Guides.com.
Install the Server into a Rack
WARNING! Do not attempt to lift the server alone. The server can weigh as much as 32 kilograms
(70 lbs.). Serious injury may result if this warning is not observed.
To insert the server into the rack, follow these steps:
1. Engage the server slides or mounting kit, as appropriate.
2. Slide the server inward and push the server into the rack until it is in position.
3. Connect server cables to rear panel connectors.
4. Connect the rack/facility ground cable to chassis ground lug.
5. Replace or tighten (as appropriate) the screws that fasten the server to the rack.
Installing Disk Drives
The supported configuration of a server includes one, two, or three Low-Voltage-Differential
(LVD), hot-plug disk drives. If any of the three disk drives are not installed, you must install a
disk filler in the disk location.
Hot-plug disk drives are located at the front of the server. The following sections describe how
to install a hot-pluggable disk drive.
CAUTION: A hot-plug device may require interaction with the operating system before the
device can be safely removed from or installed into the server. Determine if the operating system
supports replacement of disk drives while the operating system is running. If the operating
system does not support this feature, shut down the operating system before performing these
procedures. Failure to observe this caution could result in system failure.
Figure 3-2 Front View of hp Integrity cx2600 Server
Removing Hot-Plug Disk Drives
Slots are provided for up to three hot-plug disk drives in your hp Integrity cx2600 Server. When
disk drives are not installed, filler assemblies are installed to prevent air leakage and ensure
adequate cooling.
24 Installing Additional Components