SpectraLink Corporation Installation
Link WTS – Link 3000 MCU
Part Number: 72-0059-01-J.doc Page 45
10.1 Site Preparation Checklist
If upon arrival the SpectraLink field service engineer determines that the pre-
installation work has not been completed correctly, the engineer has two options: 1)
the engineer can leave the site and reschedule the installation when the action items
have been completed or corrected, or 2) the engineer can assist in preparing the site,
and thus spend additional time installing the system. Because of the additional cost
incurred by SpectraLink in executing either option, the customer will be billed for
the additional time at the standard hourly rate plus expenses.
Please be sure the following items are completed.
MCU location prepared. Typically the MCU is installed in the telephone
equipment room. This location must have sufficient rack or backboard space and
power available.
Two-pair wires are run to each of the Base Station locations as designated on the
building floor plans. Use Level 3 cable for lengths up to 3,500 feet; Level 4 for
lengths up to 6,000 feet.
The Base Station cables are terminated with RJ-45 crimp-on plugs at the
designated locations.
One (or two) cross-connect block(s) are installed for every Interface Module and
connected with a 25-pair Telco cable terminated with an RJ-21 male connector at
the MCU location.
The Base Station cables are terminated at the appropriate cross-connect blocks.
Analog or digital ports, one per handset, from the switch are terminated at the
appropriate cross-connect block and the block is labeled with the extensions.
A dedicated dial line (MB) is available with an RJ-11 jack for the diagnostic
modem.
An IBM-compatible PC is available to serve as the Operator’s Console for
system administration.
A system administrator is designated for the SpectraLink system. This person
should be present for the installation. The SpectraLink field service engineer will
provide system training to the system administrator on the day following the
installation.
When this checklist is completed please sign, date, and fax to:
Install Coordination at 303-449-7016
Signature: _______________________________________ Date: _________________
If you have any questions regarding the installation procedure, please call
the SpectraLink Customer Support Hotline at 1-800-775-5330 (Monday
through Friday, 6 a.m. to 6 p.m. Mountain time).