Siemens PAL-1 Installation Instructions Manual

Download Installation instructions manual of Siemens PAL-1 Printer for Free or View it Online on All-Guides.com.

Brand: Siemens

Category: Printer

Type: Installation instructions manual for Siemens PAL-1

Pages: 6

Download Siemens PAL-1 Installation instructions manual

Siemens PAL-1 Installation instructions manual - Page 1
1
Siemens PAL-1 Installation instructions manual - Page 2
2
Siemens PAL-1 Installation instructions manual - Page 3
3
Siemens PAL-1 Installation instructions manual - Page 4
4
Siemens PAL-1 Installation instructions manual - Page 5
5
Siemens PAL-1 Installation instructions manual - Page 6
6
1
Installation Instructions
Model PAL-1
Parallel Printer
P/N 315-092408-14
Siemens Industry, Inc.
Building Technologies Division
8 Fernwood Road
Florham Park, New Jersey 07932
Siemens Canada Limited
Building Technologies Division
2 Kenview Boulevard
Brampton, Ontario L6T 5E4 Canada
Operation
The model PAL-1 from Siemens Industry, Inc. allows the connec-
tion of an ITE Centronics parallel printer to the Siemens FireFinder-
XLS, MXL, FireFinder-NCC, FC2025, FC2050, FC922, FC924,
Desigo CC and Cerberus DMS systems. See the manufacturer's
installation manual for self diagnostics.
The PAL-1 printer can be used with control panel models XLS,
FC2025, FC2050, FC922, FC924, NCC, Desigo CC, and Cerberus DMS
Management Systems in UL864 and ULC-S527 installations. The PAL-1
printer can be used in UL2572 installations, Control and Communication Units for Mass Notification. For
supplementary use only, the NCC and PAL-1 may be connected to the UL1076 approved XLS and MXL
control panels.
Installation
UPS Standby Power
The PAL-1 printer requires a standby power source in the event of the loss of primary input power (AC
mains). Refer to Figure 2 for the connection of a UPS to meet this requirement.
Figure 1
PAL-1 Printer
1
H
2
GND
3
N
4
H
5
N
9
H
10
GND
11
N
6
H
7
GND
8
N
120 VAC
UTILITY INPUT
POWER
120 VAC
UTILITY
POWER
SOURCE
DO NOT
USE
POWER TO
PRINTER
120 VAC
SEE NOTE 4
120 VAC
INPUT
POWER
AFTER FILTER
120 VAC
OUTPUT OF
THE UPS
AC
INPUT
FAIL
TERMINAL BLOCK
LOCATED ON
UPS SYSTEM
CONTROL BOARD
BATTERY
FAIL
1
NO
2
C
3
NC
4
NO
5
C
6
NC
DO NOT
USE
TO TRI-60/B6/S OR HTRI-S/-D/-R INPUT
TERMINALS. PROGRAM AS NORMALLY OPEN
TROUBLE CAUSING INPUT IN CSG-M (AccuLINK)
OR ZEUS AND FPI-32 OR DPU, AS APPLICABLE.
REFER TO TRI-60 INSTALLATION INSTRUCTIONS,
P/N 315-092329, THE TRI-B6 INSTALLATION
INSTRUCTIONS, P/N 315-093315,
OR THE HTRI-S/-D/-R INSTALLATION
INSTRUCTIONS, P/N 315-033300 OR 315-049075,
AS APPLICABLE.
OR THE TRI-S
INSTALLATION INSTRUCTIONS, P/N 315-096242 OR
315-049481,
Figure 2
UPS Wiring Diagram
NOTES:
1. All wires 14 AWG min, 600V insulation.
2. Wiring to the printer and must be 14 AWG min., 600V insulation in conduit, and located in the same room as the
control panel.
3. Use the UPS ICS Lifeline Model 9300057.
4. Standby Power requirements: 120 VAC, 3A for 24 hours.